Download the installation manual, read the installation instructions or watch the installation video and learn how to install our wall panels. Some general tips:
- Make sure the air humidity is more than 30% during and after the installation.
- Before installing your parquet floor, store the planks in closed packs on site and let them acclimatise for 24 to 48 hours.
- Choose the correct type of installation for your project. You can install the wall panels on a wooden framework, glue them to solid walls or install the panels on uneven walls